论文简介: 本文结合珠海某层高12m高大模板工程实例,详细阐述了该工程在材料选用、扣件式钢管高支撑架设计验算、施工及构造措施、安装拆除要求以及施工监测方案。通过实践检验,模板与其支架未发生任何问题,保证了本工程的施工质量及施工安全。ABSTRACT:The paper is based on a project in Zhuhai City,and introduces a 12m high scaffolding formwork support including material selection, bearing capacity calculation, installation and dismantlement procedure, details of construction, inspection procedure, etc. It is a successful case that the final result is just as designed and the construction reached the a high standard of quality and safety requirements.

论文简介:

本文结合珠海某层高12m高大模板工程实例,详细阐述了该工程在材料选用、扣件式钢管高支撑架设计验算、施工及构造措施、安装拆除要求以及施工监测方案。通过实践检验,模板与其支架未发生任何问题,保证了本工程的施工质量及施工安全。
ABSTRACT:The paper is based on a project in Zhuhai City,and introduces a 12m high scaffolding formwork support including material selection, bearing capacity calculation, installation and dismantlement procedure, details of construction, inspection procedure, etc. It is a successful case that the final result is just as designed and the construction reached the a high standard of quality and safety requirements.
KEY WORDS: steel pipe and fastener scaffolding system,high formwork support,design, construction,inspection



附件名:20101091286594450519.zip

文件大小:914K

(升级VIP 如何赚取土木币)

免费打赏
tiger0755
2010年10月09日 11:23:34
2楼
<钢结构> -2010年3期
回复
lzwmqjq
2010年10月09日 18:56:07
3楼
是房屋建筑的?
回复

相关推荐

APP内打开