新加坡耗资3亿新元复杂隧道施工方法(英文)
kcoolk
kcoolk Lv.2
2009年12月03日 12:18:05
只看楼主

论文简介: The proposed project comprises road tunnels, depressed roads, road improvement and widening of at-grade roads, construction of road related facilities, a facility building and all associated works, such as drains, retaining walls, covered linkways, relocation of bus stops and covered pedestrian overhead bridges (POB).

论文简介:

The proposed project comprises road tunnels, depressed roads, road improvement and widening of at-grade roads, construction of road related facilities, a facility building and all associated works, such as drains, retaining walls, covered linkways, relocation of bus stops and covered pedestrian overhead bridges (POB).

给城市复杂地区隧道施工方法选择提供参考。



附件名:20091231259813885254.zip

文件大小:3313K

(升级VIP 如何赚取土木币)

liuweixia889
2010年04月25日 21:16:23
2楼
很不错
回复
becharles
2011年03月11日 20:20:46
3楼
好想看看啊
回复
tunnelhaoxiaozi
2011年03月23日 22:27:57
4楼
咋个只有这么一点点 全文呢??。。
回复
w9316
2012年12月09日 15:56:33
5楼
好东东 谢谢
回复

相关推荐

APP内打开