水电专业英语,每日一段,大家共同学习
北方牧羊人
2005年04月06日 14:34:57
只看楼主

今日起,每天放上水电专业英语英文版,大家可以把译文传上,互相交流

今日起,每天放上水电专业英语英文版,大家可以把译文传上,互相交流
53ff2a088eda25afd7ae.rar
3.0 KB
立即下载
免费打赏
jdcjjz
2005年08月03日 10:31:15
12楼
请教:自动抓梁、升卧式钢闸门的英文怎么表示?谢谢各位大侠!!!
回复
北方牧羊人
2005年08月18日 07:57:47
13楼
本周非常忙碌,下周继续!!
回复
l_800
2005年08月24日 11:37:07
14楼
OK
回复
hermes_liu
2005年08月27日 08:06:19
15楼
没了?就这点阿
回复
curthber
2005年08月27日 19:40:30
16楼

我也强烈建议贴出来
回复
shuiliren@co163
2005年08月28日 10:14:39
17楼
支持楼上的!
回复
13807006037
2005年09月03日 04:04:49
18楼
东西还好,就是太少了点,上些专业名词多的段子,对照中文更好
回复
13807006037
2005年09月03日 04:15:26
19楼
我也传一段最近的施工方案,译得不一定准确,请大侠指正
回复
wb104
2005年10月06日 11:10:18
20楼
我来贴
HYDRAULIC ENGINEERING CONSTRUCTION

1 Concrete-Faced Rockfill Dams’ Plinth Construction
Essentially two types of plinth geometry have been used by the Commission namely: (1)with the apron made horizontal in a direction normal to the plinth line; (2)with the apron made horizontal in a direction normal to the dam axis. Following Cethana, plinths of the second type have been adopted to minimize excavation, especially in deep terrain. However, the gains thus achieved have not been without some compensating losses. Very awkward apron surfaces result, which do not facilitate a highly mechanized approach to the later operations of forming, concreting, drilling and grouting.In the Commission’s situation this has reduced their appeal to the point where reverting to the original design is being seriously considered.
回复
wb104
2005年10月06日 11:12:26
21楼
I. Working Plan and Method for Main Works
1. General Working Plan
1) Plan for the Irrigation Tunnel
Whole-section excavation shall be adopted for the tunnel operation, open excavation, shotcrete and rock bolt shall be applied at the mouth of the irrigation tunnel before tunnel excavation. Air compressor and pneumatic rock drill shall be deployed for the excavation, smooth face blasting shall be applied and loader shall be used for the removal of spoil. For the horizontal tunnel with the length of 20 meters, excavation will be started from the intake and for the tilted section excavation will be started from the juncture with the diversion tunnel.
Lining concrete will be done with the JS500-type mixer, steel formwork and concrete pump.
Sequence for the operation will be as the following:

2) General Work Plan for the operation of Vertical Shaft
Formwork will mainly relay on steel formwork, transportation of material will use windlass and lifting truss, concrete mixing will be done by JS500-TYPE mixer and concrete shall be transported into tunnel by pump.
The sequence for the operation will be like below:
2. Work Plan for Steel Structures
All the steel structure will be manufactured in the workshop, and test assembling and antisepsis work will be done before being transported to the Site for installation. The tram road for gate shall be embedded by the two-phase concrete. Chain wheel, windlass and manual hoist will be used for the installation of gate.
1) Manufacture and installation of Gate
2) Gate Installation
3) Manufacture and installation of the embedded Parts
The manufacture and installation of the embedded parts are as the below shown Fig.

Fig. 1 Sequence for the Manufacture of Embedded Parts
Fig. 2 Sequence for the Installation of Embedded Parts
4) Installation of Gate Lifting and Laying-down Machine
II. Plan for Irrigation Tunnel
The irrigation tunnel is located at the middle section of the diversion tunnel, and the excavation work for the irrigation tunnel can only be started when the excavation of diversion tunnel is completed. When excavation work to the irrigation tunnel at the tilted section is under operation, other work at the inlet section of the diversion tunnel has to be stopped until the excavation work is completed, the period for suck stoppage will be around 50 days.
The Sequence for the Work is like below:
Schedule for the operation of irrigation tunnel is like below shown:
Please consult the attached Table for details.
III. Special Technical and others
Method for rock excavation in the irrigation tunnel will be much the same as diversion tunnel, except for the tilted section of the tunnel. At this section, spoils will automatically drop to the diversion tunnel, from where loader and dump truck will be deployed to carry the spoils out of the tunnel.
The metal structures will be manufactured in China according to the design and will be assembled at Site. Electrical parts for volume control shall be imported from China also.