西龙池抽水蓄能电站地下洞室防渗排水问题
luiagon
luiagon Lv.2
2011年11月05日 23:15:14
只看楼主

论文简介: The underground cavity is the hydroelectric project common building. Cavity water creep and drainage arrangement does not focus attention on frequently in the engineering construction initial period by the constructor. But to later period, even after the power generation, It will bring many thorny matters. Xilongchi Pumped-storage Power Station is too. For power plant construction, The constructor adopts many means for solution the question. This article has carried on the summary discussion to it, and hoped that draws out the question value.

论文简介:

The underground cavity is the hydroelectric project common building. Cavity water creep and drainage arrangement does not focus attention on frequently in the engineering construction initial period by the constructor. But to later period, even after the power generation, It will bring many thorny matters. Xilongchi Pumped-storage Power Station is too. For power plant construction, The constructor adopts many means for solution the question. This article has carried on the summary discussion to it, and hoped that draws out the question value.



附件名:20111151320506114120.zip

文件大小:59K

(升级VIP 如何赚取土木币)
免费打赏

相关推荐

APP内打开