Auto extinguish fire system quality common failing and defend way (A)A fire auto report to the police and fire fight allied move control system1.under construction pipeline spread establish break head, little line, connect ground, short circuit hour should adopt the following measure defend Ye:

Auto extinguish fire system quality common failing and defend way

(A)A fire auto report to the police and fire fight allied move control system
1.under construction pipeline spread establish break head, little line, connect ground, short circuit hour should adopt the following measure defend Ye:
(1)Construction front earnest carry on diagram paper conduct trial jointly with technique hand over bottom.Explicit report to the police cloth point position, equipments connect line need, pipeline of spread establish direction.
(2)The spot on-the-spot investigate.The spot actual and construction diagram paper carry on more thin turn, take out detailed of possibility project and construction project, include pipeline of model number, amount and reserve etc. circumstance.
(3)Under construction strict press above-mentioned construction project and nation electricity cloth line construction standard norm carry on construction.
(4)Pipeline spread establish finish after, earnest carefully check lead line of model number, amount whether and project and diagram paper agree with, lead line of insulate resistivity whether attain request.
(5)Implement over above-mentioned work preface combine attain qualified standard after, again carry on other work preface of construction.
2. head equipments of install loose move, can’t allied move, inaccuracy hour should adopt the following prevention measure:
(1)Before install acquaint with each equipments(locator, mold piece, hand report) of connect line way and install method.
(2)Aim at construction diagram paper firm exactitude of install equipments.
(3)With other fire fight equipments allied connect of allied move mold piece or signal mold piece, before install want special attention should fire fight equipments and fire fight allied connect of connect line way and control principle.
(4)Equipments install act according to 《a fire auto report to the police design and construction acceptance norm 》performance.
3. report to the police controller of install with adjust try for avoid appear adjust impassability, allied move expiration, circulate falsely often should press the following step carry on:
(1)Earnest reading report to the police controller of usage manual, check controller of work circumstance.
(2)After the controller exactitude install normal work of under the circumstance, close controller after, connect into head each report to the police back track, again switch on circulate and check system circulate circumstance.
(3)Carry on system plait distance, press logic procedure to probe into district and report to the police district carry on plait distance, allied move correspond of mold piece, control correspond of fire fight equipments.
(4)If appear correspond of allied move equipments motionless make, at this time should check mold piece work whether normal.If mold piece work normal, at this time should be beg allied move equipments of construction square match, common moderate solve.
(5)If appear stretch forward report to the police break down or always report to the police, or experiment don’t report to the police, should check stretch forward whether damage or replace stretch forward.
(6)be check adjust try completion above-mentioned qualified after, square can get into try circulate, end carry on acceptance.