南京明孝陵方城加顶方案可行性研究(英文)
wygoal
wygoal Lv.2
2011年02月19日 20:49:00
只看楼主

论文简介: This paper demonstrated the feasibility of the adding roof on Ming Dynasty Castle in the Square City of the Ming Tomb. First, the structure composition of the existing ground in Square City and the wall of Ming Dynasty Castle was proved preliminary, through CT imaging of electromagnetic waves and on-site trench. Second by means of FEM, the stress and deformation of the wall load imposed were simulated. At last, the strain deformation of corridor in long period was monitored by grating sensors. It repeatedly demonstrated that the programs of adding roof on Ming Dynasty Castle can be achieved in the technology.

论文简介:

This paper demonstrated the feasibility of the adding roof on Ming Dynasty Castle in the Square City of the Ming Tomb. First, the structure composition of the existing ground in Square City and the wall of Ming Dynasty Castle was proved preliminary, through CT imaging of electromagnetic waves and on-site trench. Second by means of FEM, the stress and deformation of the wall load imposed were simulated. At last, the strain deformation of corridor in long period was monitored by grating sensors. It repeatedly demonstrated that the programs of adding roof on Ming Dynasty Castle can be achieved in the technology.



附件名:20112191298119740303.zip

文件大小:500K

(升级VIP 如何赚取土木币)

免费打赏
yy_555
2011年03月05日 10:17:24
2楼
挺有见地,不错,很有价值,哥们理论水平很高啊,下的功夫不少吧!
回复
mengxb5687
2011年08月06日 17:58:25
3楼
欺负吾等英语不好者!
回复

相关推荐

APP内打开